Spray 22 Gallery - standing and fairing the frames p3
Roberts Spray 22 Gallery
Round Bilge wood epoxy version under construction
standing and fairing the frames p3

Frames with floors attached and bulkheads ready for hoisting onto the strongback

Building the strongback

As with most outdoor building some way must be found to make the strongback level.
Here old telephone poles are going to be used.

The frames being braced firm at the correct distance apart.

Permanent and temporary frames standing

Note the notches in the frames to take the keelson

Another milestone. The stem fitted in position.

Roberts Spray 22 Gallery
Round Bilge wood epoxy version under construction
standing and fairing the frames p3
Frames with floors attached and bulkheads ready for hoisting onto the strongback
Building the strongback
As with most outdoor building some way must be found to make the strongback level.
Here old telephone poles are going to be used.
The frames being braced firm at the correct distance apart.
Permanent and temporary frames standing
Note the notches in the frames to take the keelson
Another milestone. The stem fitted in position.