Coastworker 30 MK2 Gallery - Hull and Wheelhouse - p2

Hull and wheelhouse

Internal Framing

Rails installed. Note the splash rail the Graham has installed.

And the 1/2 pipe rub rail aft.

Above and below. Three shots of this fine vessel showing the extended
wheelhouse Graham has created..


A truly fine job.
Nearly finished interior

With only approximately six weeks to the launching everything is taking shape.

Looking forward down into the V berths.

Neat and functional steering station.

A few loose ends to fix!

The engine positioned beneath the salon floor.


Looking through from the aft deck.
There are no products to list in this category.
