Coastworker 30 MK2 Gallery - Hull and Wheelhouse - p2
Hull and wheelhouse

Internal Framing

Rails installed. Note the splash rail the Graham has installed.

And the 1/2 pipe rub rail aft.

Above and below. Three shots of this fine vessel showing the extended
wheelhouse Graham has created..


A truly fine job.
Nearly finished interior

With only approximately six weeks to the launching everything is taking shape.

Looking forward down into the V berths.

Neat and functional steering station.

A few loose ends to fix!

The engine positioned beneath the salon floor.


Looking through from the aft deck.

Hull and wheelhouse
Internal Framing
Rails installed. Note the splash rail the Graham has installed.
And the 1/2 pipe rub rail aft.
Above and below. Three shots of this fine vessel showing the extended
wheelhouse Graham has created..
A truly fine job.
Nearly finished interior
With only approximately six weeks to the launching everything is taking shape.
Looking forward down into the V berths.
Neat and functional steering station.
A few loose ends to fix!
The engine positioned beneath the salon floor.
Looking through from the aft deck.